Engineering Mechanics

International Conference

Proceedings Vol. 24 (2018)


ENGINEERING MECHANICS 2018

24th INTERNATIONAL CONFERENCE
May 14 – 17, 2018, Svratka, Czech Republic
;
Editors: Cyril Fischer and Jiří Náprstek

Copyright © 2018 Institute of Theoretical and Applied Mechanics of the Cech Academy of Sciences, Prague

ISBN 978-80-86246-88-8 (printed)
ISBN 978-80-86246-91-8 (electronic)
ISSN 1805-8248 (printed)
ISSN 1805-8256 (electronic)

list of papers scientific commitee

Recovery of some of waste gas derived from clinker production installation at Górażdże cement plant
Nawrot A., Pochwała S., Stęplowski S.
pages 577 - 580, full text

The process of clinker production, during which the principal component of cement is produced, generates considerable volumes of waste gas. This flow of gas in the rotary kiln forms an indispensable part of the clinker burning process. The hot gas at the exhaust of the clinker installation still has an adequately high temperature to enable its recovery in a process that is both feasible and profitable. As a consequence of the recovery and use of some of the energy in this gas, it will be possible to provide hot water to office and common spaces in the plant. The projected shell-and-tube heat exchanger was designed so as to condition the gas so that it achieves an adequate temperature that can be applied to reduce the cost of central heating and provide network hot water production.


back to list of papers

Text and facts may be copied and used freely, but credit should be given to these Proceedings.

All papers were reviewed by members of the scientific committee.


Publication Ethics - Ethical guidelines for publication
Webmaster contact: admin@it.cas.cz

imce   Powered by Imce 3.20  © 2023, Pavel Formánek, Institute of Thermomechanics AS CR, v.v.i. [generated: 0.0287s]